Job Vacancies   |   Webmail   |   Phonebook   |   Add To Favorites !   |   Contact us

Useful Links

News & Events

Nimule Road | 23.01.2010
Work is to vigorously progress on the section 3 (67km) of the 192km Juba-Nimule highway of the project that will transform the congested rout into the long-anticipated tarmac highwa
Refinery Investment | 08.05.2010
Under the authority of the Government of South Sudan (GoSS), and the direct involvement of the Ministry of Energy & Mining (MEM) ‿GoSS (Juba), the "Akon Refinery Company Ltd.". . .

Our Contacts

Eyat Group
Plot No 2A, Block (6) Airport road
Juba town - South Sudan
Tel:   +211927784861
Tel:   +211912502205

EYAT Roads & Bridges

EYAT Roads & Bridges According to the company's mission, development is helping in sustaining peace within the country .Building the country's infrastructure is the core basis for development. Therefore EYAT Roads & Bridges division has emerged to implement this concept.

EYAT Roads & Bridges was established in 2002. It's a business name owned by EYAT Oilfields Services Co. Ltd., specialized in constructing roads, bridges, digging wells and haffirs (Water Storage Reservoirs) and infrastructure projects.

Roads & Bridges Division is mainly involved in building infrastructure such as roads, bridges and water stations.

Roads & bridges division has the capability of building roads & bridges to facilitate and improve people?s way of life according to the highest level of technical specifications.This is mainly due to the professional staff that we have, new quality machineries and tools and robust way of administration.

Drilling Section

The drilling section consists of 4 sub-sections:
1.   Water Section.
2.   Water Wells Drilling.
3.   Piling.
4.   Mining Rigs.

Equipments of Water Section & Water Wells Drilling:
1.   2 Drillmec Rigs Model G38 (Capacity 2000 ft.).
2.   1 Drillmec Rig Model MR2000 (Capacity 1000 ft.).
3.   1 Atlas Capco Rig (Capacity 600 ft.).

Equipments of Piling:
1.   Soilmec 108 Truck Mounted Rig.
2.   Soilmec 312 chained Rig.

Equipments of Mining:
1.   3 Soilmec Rigs Model 150.
    A deal has been signed to purchase 10 additional rigs (5 rigs model G38 , 5 rigs model G25) and 4 of the G38 is already shipped.

COMPLETED PROJECTS:
1.   Akwaim Water Station.
2.   Wanjok Camp Water Station.
3.   Aweil Water Wells.
4.   Several water wells in Malual Kon, Akon, Warawar, Maleet, Kowajok, and Niyamlail.
5.   Maintenance of Wau Water Network.
6.   Installing 6 new water tanks in Wau (Capacity 7,000 Gallons).

EYAT Roads & Bridges Projects

Project Title DAMAZIEN -QEISSAN GRAVEL ROAD
Client Blue Nile State Government
Location Blue Nile State
Description Damazien-Qeissan graveled road section 1 (20km) in Blue Nile State
Starting Date 2006
Completion Date 1998


Projects Photo Gallery

In 1963, Rolex for the first time launched the rolex replica Daytona watch, in order to meet the needs of endurance racing drivers and replica watches carefully designed. With a reliable speedometer scale outer ring, the highest speed up to 400 km per hour. In the dial on the configuration of swiss replica watches the central, minute and second hand; small second hand set at 6 o'clock position; through the central pointer to the timer precision to replica watches uk 1/8 seconds, 30 minutes and 12 hours timer disk were set at 3 and 9 o'clock position;
  • cheap jimmy choo UK
  • mac cosmetics wholesale
  • chaussure trail salomon
  • chaussure salomon
  • tiffany jewellery uk
  • mac makeup uk
  • cheap mac makeup UK
  • cheap mac makeup
  • cheap tiffany
  • mac cosmetics sale
  • mac makeup kit